Australia’s largest ever infrastructure project “Gorgon LNG”, located 60km offshore, relied on Putzmeister equipment to get the job done. Constructing any $60 Billion project has its challenges, but when located 60km off the mainland, the word logistics takes on a whole new meaning!

PROJECT NAME: Gorgon LNG

LOCATION: Barrow Island, Western Australia

CONTRACTORS & PUTZMEISTER EQUIPMENT:

CB&I – 3 x BSF58 Concrete Pumps, 1 x BSA2110 High Pressure Trailer Pump and 1 x MX36 Stationary Placing Boom

Leighton Contractors – 2 x BSF47 and 2 x BSF36 Concrete Pumps plus 1 x TB 130 Telebelt and 1 x TBS 600 Telebelt (the latter both supplied by Mobile Conveying Services, Qld)

SUMMARY:

Even the most simple items take a minimum of one week to arrive on site by barge, making reliability paramount for the machines in operation. With this in mind, Putzmeister concrete pumping equipment was chosen to service over 90% of the concrete placing requirements. So what does it take for this sort of project? The Putzmeister equipment CB&I / Meales used includes 3 x 58m 5 stage booms, 1 x BSA 2110 high pressure trailer pump and 1 x MX Stationary Placing boom for servicing the massive LNG tanks. Whilst Leightons called on 2 x 36m and 2 x 47m Putzmeister mobile boom pumps for placing the 150,000 cubic metres of concrete for the main civil package, and two Putzmeister Telebelts - the TB 130 truck mounted unit and the new TBS 600 Semi trailer type (both supplied by Mobile Conveying Services, Qld) for placement of materials in the Material Offloading Facility.

From the first pump on site to the completion of the project Putzmeister equipment was on site for approximately 5 years, and proves the confidence large contractors have in Putzmeister equipment to “get the job done”.